2014. Reconstruction of a LANG 12 MW turbine
- Home
- References
- Energy, oil and industrial works references
- 2014. Reconstruction of a LANG 12 MW turbine
2014 Reconstruction of a LANG 12 MW condensation turbine manufactured in 1956
During the reconstruction, work was carried out to restore the casing and the entire flow path of the turbines.
Customer: VKG Energia OU (Estonia)