2017-2018. Reconstruction of the boiler house with the installation of a hot water boiler with a capacity of 4.5 MW
- Home
- References
- Energy, oil and industrial works references
- 2017-2018. Reconstruction of the boiler house with the installation of a hot water boiler with a capacity of 4.5 MW
2017-2018. Reconstruction of the boiler house with the installation of a hot water boiler with a capacity of 4.5 MW
Scope of work: Turn-key project. As part of the contract, the following works were performed: design of a bio-boiler plant with a capacity of 4.5 MW operating on sawdust, manufacturing of a fuel supply line, supply and installation of the boiler, as well as all auxiliary process equipment of the boiler house, construction, installation, finishing work, commissioning, training of operational boiler room personnel, warranty service
Customer: AB "Vilniaus baldai" (Lithuania) Furniture factory